|
C.M.R. Enterprise Last Updated: August 10, 2011 |
|---|
Complete kitchen remedel, torn back to the studs and replaced
We ripped up the linolium and put in a new sub floor, added electrical as needed installed moisture resistant green board Patched the old vent hole Had a plasterer come in and put a smooth slury over all The cabinets were installed We painted and the flooring and counter tops were in stalled



